close

SCULPTURE INSTALLATION

Summit Pointe’s newest art installation, Green Dragon Rhythm by Rob Lorenson, is an urban streetscape sculpture. His metal work is an expression of form, space and place making. For Rob, every space is a new challenge, and every client is a new friend. This new sculpture provides visual engagement as well as cultural and social value. It has been installed on the plaza at 555 Belaire.

Pictured above: L to R Rob Lorenson and Lorrie Saunders


NEXT ON THE DRAWING BOARD: VISTA

If you’ve driven by Summit Pointe lately, you’ve probably seen the six-story Mosaic apartment building rising quickly. The foundation of the third block at Summit Pointe will include a total of 270 apartments. Mosaic, with 167 apartments, is scheduled to deliver in November 2022, and the next construction will be Vista, a second apartment building on that same block with 103 units. Vista will offer a new product at Summit Pointe, and eight residences are designed as two-story lofts with street-level access. The shared courtyard amplifies an urban lifestyle with a resort-style swimming pool, lap pool with infinity edge, cabanas, firepits, dog walk and dog-wash station.

EXCELLENCE IN CONSTRUCTION AWARDS

Summit Pointe was recently awarded two Awards of Excellence by Associated Builders and Contractors at its 8th Annual Construction Awards. 555 Belaire was acknowledged in the commercial category, and Helix was acknowledged in the residential multi-family category. Our congratulations to the team including Clancy & Theys Construction Co.; Saunders & Crouse Architects; Speight, Marshall & Francis P.C., Kimley-Horn, Hickman-Ambrose, Inc. and Pace Collaborative P.C. engineers; and all of the ABA VA members.


CORK & BULL HAS
A NEW WEBSITE!

We are all eager to welcome Cork & Bull to Summit Pointe. In the meantime, you can learn more about the delicious offerings that are coming our way on the new website.

Click www.corkandbulichophouse.com

amenities

free Parking
vehicle Charging stations
car Detailing